Local planning (also called land-use planning) determines where and how building is permitted in Walchwil. Its main instruments are the zoning plan and the building regulations. They are adopted by the municipality and approved by the canton.[1] Above them in the planning hierarchy stand the federal Spatial Planning Act (RPG) and the Canton of Zug's structure plan.[2]
The most recent comprehensive revision was approved by voters at the ballot box on 28 September 2025. It has been legally binding since 16 June 2026, except for the Mägeristrasse and Büel areas.[3]
Procedure
The procedure is governed by the cantonal Planning and Building Act (PBG, BGS 721.11) of 26 November 1998:[1]
- Preliminary review: The municipal council has the draft examined by the cantonal Building Department (§ 39 para. 1).
- Public display: The revised draft is put on public display and announced in the Official Gazette. During the display period, anyone may submit objections in writing (§ 39 paras. 2–3).
- Vote: Then “the municipality votes” on the proposals, either at the municipal assembly or at the ballot box. The vote disposes of the objections (§ 39 para. 4).
- Publication and appeal: The decision is published in the Official Gazette. Anyone particularly affected may lodge an appeal with the cantonal government (§ 41).
- Approval: The canton examines whether the planning complies with federal law, cantonal law and the structure plan (§ 42).
The municipal council can approve minor changes itself (§ 40).[1]
Chronology
| Date | Event |
|---|---|
| before 2006 | Invited competition among four architectural firms, held by the municipality and the parish community, for a development at the heart of the village (reported in Tugium 2006).[4] |
| 30 March 2006 | Building regulations of the municipality of Walchwil (2006 revision of the local plan). Among other things, they designated the Lienisberg sports ground as an “other zone with special regulations” (§ 27).[5] |
| 7 May 2007 | The 2006 building regulations come into force.[6] |
| 2006/2007 | The revision made developments possible in the Utigen, Rägeten, Lauihof and Büel areas. According to the mayor, the landowners there bear around 55% of the cost of the 2nd stage of the Oberdorfstrasse, and the municipality around 45%.[7] |
| 9 December 2009 | The municipal assembly adopts the hazard zone plan. The cantonal government approves it except for four disputed plots; the Administrative Court dismisses an appeal on 26 April 2011.[6] |
| 7 March 2010 | Ballot: around 60% in favour of a credit of Fr. 29.5 million for the 2nd stage of the Oberdorfstrasse (“northern access road”), turnout around 70%.[7] |
| 28 February 2012 | The cantonal government proposes to the cantonal parliament (Kantonsrat) two new structure plan designations for Walchwil: the Lienisberg recreation hub and an above-ground double track for the railway.[5] |
| 30 November 2016 | The municipal assembly discusses an amendment to the building regulations for the Lienisberg sports facilities (outcome not documented).[8] |
| May 2018 | Lauihof development plans put on public display: 17,000 m², twelve buildings.[9] |
| 13 October 2018 | Opening of the Oberdorfstrasse (1.26 km, around Fr. 42 million for both stages).[7][10] |
| Winter 2019/2020 | Start of the revision of the local plan with a working group (parties, local businesses, building commission) and a “sounding group”; planning firm R+K Raumplanung AG.[11] |
| before November 2021 | Public consultation on the “Spatial Strategy”.[12] |
| 30 November 2021 | The municipal assembly discusses the credit for a study commission on the “Zentrumsbogen”.[12] |
| 18 February 2025 | Information event in the municipal hall.[13] |
| 20 February – 24 March 2025 | Public display of the building regulations and zoning plan.[13] |
| 22 April 2025 | The municipal council announces the winning project for the “Zentrumsbogen”.[14] |
| 28 September 2025 | Ballot: 745 yes, 590 no (55.8% yes), turnout 64%.[15] |
| 13 May 2026 | Cantonal approval by the Building Department.[3] |
| 16 June 2026 | The new zoning plan and new building regulations become legally binding. The Mägeristrasse and the Büel are excluded (appeals pending). The riparian zone has not yet been defined.[3] |
2025 revision of the local plan
The revision is intended to guide spatial development “over the next 20 years”.[11] According to the municipal council, its priorities are:[3]
- an attractive village centre,
- the protection of green and recreational spaces,
- additional housing in the already built-up area through moderate densification,
- better conditions for affordable housing,
- development opportunities for local businesses.
The most debated issue was the large development planned in the Büel area below the railway line, where buildings of up to eight storeys are to be allowed. Opponents distributed leaflets before the vote, and the Korporation, the village's traditional commons corporation, responded with a leaflet of its own.[16] Appeals against the provisions for the Büel and the Mägeristrasse are still pending (as of June 2026).[3]
As part of the revision, a site on the Kirchgasse was rezoned as a public-interest zone for buildings and facilities (OeIB). A new kindergarten is planned there.[17]
On the same day two other Zug municipalities, Cham (around 60% yes) and Hünenberg (around 56% no), also voted on their local plans.[16]
Building zones
Walchwil's building zones cover around 83 hectares. This figure barely changed between 2010 and 2024, so in that period no significant amount of land was either zoned for building or dezoned. The share of building land still undeveloped fell from 18.1% (2010) to 13.9% (2024).[18]
| Year | built on (ha) | not built on (ha) | Total (ha) | Share not built on |
|---|---|---|---|---|
| 2010 | 68.00 | 15.00 | 83.00 | 18.1% |
| 2011 | 68.00 | 15.00 | 83.00 | 18.1% |
| 2012 | 66.66 | 16.14 | 82.80 | 19.5% |
| 2013 | 66.50 | 16.30 | 82.80 | 19.7% |
| 2014 | 67.25 | 16.11 | 83.36 | 19.3% |
| 2015 | 67.78 | 15.57 | 83.35 | 18.7% |
| 2016 | 67.72 | 15.26 | 82.98 | 18.4% |
| 2017 | 68.32 | 14.66 | 82.98 | 17.7% |
| 2018 | 68.40 | 14.58 | 82.98 | 17.6% |
| 2019 | 69.47 | 13.51 | 82.98 | 16.3% |
| 2020 | 70.06 | 12.93 | 82.99 | 15.6% |
| 2021 | 70.23 | 12.76 | 82.99 | 15.4% |
| 2022 | 70.23 | 12.76 | 82.99 | 15.4% |
| 2023 | 70.59 | 12.41 | 83.00 | 15.0% |
| 2024 | 71.44 | 11.56 | 83.00 | 13.9% |
Source: the Canton of Zug's Office for Spatial Planning and Transport.[18] Figures from before the 2025 revision of the local plan do not yet reflect its changes.
For comparison: in 2024 the Canton of Zug as a whole had around 2,281 ha of building zones, 10.7% of which were not built on. Walchwil thus has around 3.6% of Zug's building zones; its share of undeveloped land is higher than the cantonal average.[18] More figures are given in the article Data and statistics.
Cantonal structure plan
The structure plan of the Canton of Zug was adopted by the cantonal parliament in January 2004 and has been amended several times since.[2] The key provisions for Walchwil are as follows (as of August 2026):
Spatial type and growth
- Walchwil, along with Neuheim and Menzingen, is classed as cultural landscape. This area is to absorb only around 5% of Zug's population and employment growth up to 2040. The three villages are to strengthen their “niche strategy” and continue to develop “within the existing fabric”, taking account of townscape protection (G 9.4).[2]
- Binding planning targets (G 2 and G 3):[2]
| Indicator | Baseline | Target 2040 |
|---|---|---|
| Permanent resident population | 3,626 (2016) | 4,200 |
| Employees (2nd and 3rd sectors) | 1,004 (2014) | 1,050 |
At the end of 2025 Walchwil had 4,012 inhabitants.[19] These targets may be exceeded through densification within the existing settlement area (G 2.2).[2]
Settlement area
- The settlement area is defined as the extent of the building zones in the legally binding zoning plans at the end of 2017. Across the canton, it may be enlarged by no more than 10 ha at the next revision (boundary adjustments), plus no more than 25 ha for public buildings up to 2040 (S 1.1.1).[2]
- The municipalities forgo “substantial new zoning of building land” (S 1.1.4). When revising their plans, they consider dezoning residential zones that are unavailable, oversized employment zones and building zones in sensitive landscapes (S 1.1.3).[2]
- Settlement boundary lines define the edges. Solid lines leave no leeway, dashed lines a leeway of one to two building depths (S 2.1).[2]
- High-rise buildings over 30 m are permitted only in the “urban landscape”, and therefore not in Walchwil (S 3.1.1).[2]
Projects in Walchwil
| Chapter | Project | Status |
|---|---|---|
| L 8 | Assisted circulation in Lake Zug (compressor station and diffusers) | designated[2] |
| L 8.3.5 | Renaturation of the Rufibach delta and other deltas | priority 5 (implementation after 2040)[2] |
| L 10 | Harbour in the Loch area with no more than 50 berths; removal of the present buoy field | designated[2] |
| L 11.1 | Cantonal recreation hub Lienisberg | designated (proposed 2012)[2][5] |
| M 4 | Noise abatement on the NEAT approach line Zug–Walchwil–Arth-Goldau; footpath Arth–Walchwil | mandate to the canton[2] |
For the double track near Walchwil (around 1.7 km), the cantonal government proposed an above-ground route in 2012. A tunnel option would have required a portal in the middle of the settlement area, which the cantonal government judged to be an “intrusion into the townscape”.[5]
Townscape protection

ISOS
Walchwil is not a site of national importance in the Federal Inventory of Swiss Heritage Sites (ISOS). The Canton of Zug has 14 such sites, including the town of Zug, Cham, Niederwil, the former hotel complexes of Schönfels/Felsenegg on the Zugerberg (municipality of Zug) and the lakeshore settlement landscape of Risch/Buonas. There is none in Walchwil itself.[20] The ISOS surveys in the Canton of Zug date from 1988; the second version dates from February 2000.[21]
Whether Walchwil is classified in the ISOS as a site of regional or local importance could not be established (see Open questions).
Townscape protection zone
The structure plan requires municipalities revising their zoning plans to define townscape protection areas precisely and to lay down protective rules. They are to work with the Office for Heritage Conservation and Archaeology and use the ISOS as a planning aid (S 7.2).[2]
Walchwil has a townscape protection zone. It covers the village core on the slope around the Parish Church of St John the Baptist, including the Sternenmatte and the Kirchgasse.[17] According to the competition documents, the Sternenmatte is one of the oldest built-up parts of the village. New buildings here should fit in with the terraced slope and not obscure the parish church.[17] The Wihel site south of the school building, by contrast, lies outside the townscape protection zone. Here, however, the setting of the listed Wihel farmstead (farmhouse 1819, barn 1901) must be respected.[22] Individual protected buildings are listed in the article Protected monuments in Walchwil.
Major projects
Village centre and “Zentrumsbogen”
The “Zentrumsbogen” (central arc) is the semicircular area between the Dorfstrasse and the Kirchgasse. It is earmarked for flats, shops, workplaces, affordable housing and a day-care centre. The design study was won by the planning consortium Mirlo Urbano/Brühlmann Loetscher with Appert Zwahlen Partner (landscape architecture). The project was presented to the public on 8 May 2025.[14] As early as 2008, the local Social Democrats, the SP Walchwil, had called for a comprehensive plan for the properties in the village core.[23]
A first step was a competition reported by the cantonal heritage conservation office in 2006: the municipality and the Catholic parish wanted a central development that would improve the village core in terms of function, townscape and architecture. New buildings were to provide space for the municipal administration and the parish community, together with reserve space, a restaurant and a shop. Four architectural firms were invited to take part in the competition.[4] For the redevelopment of the village core, the house at Dorfstrasse 17 was demolished in 2011, after first being investigated.[24] The new municipal building on the Dorfplatz next to the parish community hall was due to be completed in summer 2014.[25]
School site
- Kirchgasse kindergarten: Purchase of the plots at Kirchgasse 2 and 4 for Fr. 2.96 million (December 2025). The plan is for four kindergarten classes in one building, at a total cost of around Fr. 8.3 million, ready for the 2029/30 school year.[26][17]
- Out-of-school childcare (SEB) Wihel: New building on the Wihel land reserve (OeIB zone) with around 120 parking spaces in an underground car park. Total cost around Fr. 22 million, of which around Fr. 13 million is for the underground car park. The building credit is to be requested in winter 2028.[22]
Lakeshore
- Loch harbour: The structure plan provides for a harbour with no more than 50 berths; the buoy field is to be removed.[2] In 2025 the municipality budgeted Fr. 190,000 for the refurbishment of the buoy field.[27]
- Seebad: In June 2026 the municipal assembly approved a credit for a competition and project planning for the extension of the lido.[28]
- Lake access points: The 2025 budget included costs for new access points to the lake.[27]
- Shore renaturation: Rufibach delta and other deltas, after 2040 according to the structure plan.[2]
Housing developments on the slope
- Lauihof: 17,000 m², six blocks of flats, four detached houses and two stepped terrace buildings (public display 2018).[9]
- Utigen/Rägeten: 34 residential units above the Oberdorfstrasse (planning application put on display in November 2025).[29]
- Büel: Large development with up to eight storeys below the railway line; not yet legally binding.[16][3]
Consequences of the Spatial Planning Act
On 3 March 2013 the Swiss electorate approved the revision of the Spatial Planning Act (RPG 1). It requires smaller building zones and more densification. In Walchwil 687 people voted yes and 443 no (60.8% yes); in the Canton of Zug the yes vote was 71.4%.[30] Walchwil rejected the Urban Sprawl Initiative on 10 February 2019 by 839 votes to 280 (25.0% yes).[31]
The Canton of Zug implemented RPG 1 in its structure plan: the settlement area is limited to the building zones as at the end of 2017, and the municipalities must examine dezoning when revising their plans.[2] In Walchwil the building zone area remained at around 83 ha until 2024. No dezoning is apparent in the canton's data.[18] At the municipal assembly of 30 November 2022, a “dezoning” was discussed in connection with the decision not to build a recycling centre in the Wihel area; its content and outcome are not documented.[32]
Open questions
- ISOS classification: Walchwil is not in the federal inventory (national importance). Whether the ISOS survey classifies Walchwil as being of regional or local importance has not been checked. The ISOS platform (gisos.bak.admin.ch) could not be queried without JavaScript.
- 2006 building regulations: Whether the building regulations of 30 March 2006 were adopted at the municipal assembly or at the ballot box is unclear. Earlier zoning plans (before 2006) are not documented either.
- 2025 local plan: The area of the building zones after the revision, any zoning or dezoning, and the reasons for the ballot (instead of a decision by the municipal assembly) are not documented. The documents (report under Art. 47 RPV, synopsis of the building regulations, zoning plan) are available on the municipality's website.
- Approving authority: The 2026 competition documents mention “approval by the cantonal government”, whereas the municipality reports approval by the Building Department.[17][3]
- 2021/2022 data: The building zone statistics show identical figures for 2021 and 2022; the figures may not have been updated for 2022.
- Double track: The construction and commissioning of the Walchwil double track are not documented here.
References
- ↑ 1,0 1,1 1,2 Kanton Zug: Planungs- und Baugesetz (PBG), BGS 721.11. Of 26 November 1998, version in force since 23 October 2021, §§ 39–42, accessed 29 October 2026.
- ↑ 2,00 2,01 2,02 2,03 2,04 2,05 2,06 2,07 2,08 2,09 2,10 2,11 2,12 2,13 2,14 2,15 2,16 2,17 Baudirektion des Kantons Zug, Amt für Raum und Verkehr: Kantonaler Richtplan. Richtplantext. Status: cantonal parliament decisions up to 27 August 2026, produced on 31 August 2026, accessed 29 October 2026.
- ↑ 3,0 3,1 3,2 3,3 3,4 3,5 3,6 Gemeinderat Walchwil: Die revidierte Ortsplanung von Walchwil ist rechtskräftig. In: punkt-walchwil.ch, 25 June 2026, accessed 29 October 2026.
- ↑ 4,0 4,1 Stefan Hochuli, Georg Frey: Amt für Denkmalpflege und Archäologie. Walchwil, Dorfzentrum: Quartierplanung, Wettbewerb. In: Tugium 22 (2006), pp. 35–36, e-periodica.ch, accessed 4 November 2026.
- ↑ 5,0 5,1 5,2 5,3 Regierungsrat des Kantons Zug: Kantonsratsbeschluss betreffend Anpassung des kantonalen Richtplanes (Walchwil; Schwerpunkt Erholung und Bahnverkehr). Bericht und Antrag. Bill no. 2117.1, 28 February 2012, accessed 29 October 2026.
- ↑ 6,0 6,1 Baudirektion des Kantons Zug: Urteile und Entscheide in Sachen Planungs- und Baurecht, 2011: Verwaltungsgericht (judgments of 26 April and 22 December 2011), accessed 29 October 2026.
- ↑ 7,0 7,1 7,2 ZUG4YOU: Project Oberdorfstrasse: the struggle comes to an end. 10 October 2018 (after Zuger Zeitung), accessed 29 October 2026.
- ↑ SP Walchwil: Zur Gemeindeversammlung vom 30. November 2016. 18 November 2016, accessed 29 October 2026.
- ↑ 9,0 9,1 ZUG4YOU: Twelve buildings planned for Lauihof development. 22 May 2018 (after Zuger Zeitung), accessed 29 October 2026.
- ↑ ZUG4YOU: Details of festivities announced. 9 July 2018 (after Zuger Zeitung), accessed 29 October 2026.
- ↑ 11,0 11,1 Gemeinderat Walchwil: Abstimmung zur Ortsplanungsrevision. In: punkt-walchwil.ch, 28 August 2025, accessed 29 October 2026.
- ↑ 12,0 12,1 SP Walchwil: SP Walchwil zur Gemeindeversammlung (of 30 November 2021), 25 November 2021, accessed 29 October 2026.
- ↑ 13,0 13,1 Gemeinderat Walchwil: Ortsplanungsrevision – Start der öffentlichen Auflage. In: punkt-walchwil.ch, 18 February 2025, accessed 29 October 2026.
- ↑ 14,0 14,1 Gemeinderat Walchwil: Walchwil präsentiert das Siegerprojekt für den “Zentrumsbogen”. In: punkt-walchwil.ch, 22 April 2025, accessed 29 October 2026.
- ↑ SRF, Regionaljournal Zentralschweiz: Abstimmungen Zentralschweiz – Resultate aus Zentralschweizer Gemeinden von A bis Z. 28 September 2025, accessed 29 October 2026.
- ↑ 16,0 16,1 16,2 ZUG4YOU: Voters reject local planning revision. 30 September 2025 (English version of an article in the Zuger Zeitung), accessed 29 October 2026.
- ↑ 17,0 17,1 17,2 17,3 17,4 Gemeinde Walchwil, Abteilung Bau/Planung: Neubau Kindergarten Walchwil. Wettbewerbsprogramm. 25 February 2026, ch. 1 and 5, accessed 29 October 2026.
- ↑ 18,0 18,1 18,2 18,3 Kanton Zug, Amt für Raum und Verkehr: Bauzonen. Fläche der bebauten und unbebauten Bauzonen in den Zuger Gemeinden, 2010 bis 2024 (dataset on data.zg.ch), accessed 29 October 2026.
- ↑ Gemeinderat Walchwil: Walchwil glänzt mit Millionenüberschuss. In: punkt-walchwil.ch, 13 April 2026, accessed 29 October 2026.
- ↑ Bundesamt für Kultur / swisstopo: ISOS – Ortsbildaufnahmen (layer ch.bak.bundesinventar-schuetzenswerte-ortsbilder), query for the area of the Canton of Zug. Accessed 29 October 2026. Map view: map.geo.admin.ch.
- ↑ Bundesamt für Kultur: ISOS. Ehem. Hotelanlagen Schönfels/Felsenegg, Gemeinde Zug. 2nd version 02.2000, accessed 29 October 2026.
- ↑ 22,0 22,1 Gemeinde Walchwil: Neubau Schulergänzende Betreuung (SEB) Walchwil. Wettbewerbsprogramm. 22 April 2026, ch. 1, 4.2 and 5.4, accessed 29 October 2026.
- ↑ SP Walchwil: Ein Zentrum für Walchwil. 9 November 2008, accessed 29 October 2026.
- ↑ Adriano Boschetti-Maradi, Armin Thürig, Anette Bieri: Walchwil, Dorfstrasse 17, Wohnhaus: Bauuntersuchung, Ausgrabung und Abbruch. In: Tugium 28 (2012), pp. 43–47, e-periodica.ch, accessed 4 November 2026.
- ↑ SP Walchwil: Interpellation der SP Walchwil betreffend Beizli im neuen Dorfzentrum. 11 March 2013, accessed 29 October 2026.
- ↑ punkt-walchwil.ch: Keine PV-Anlage, aber Platz für neuen Kindergarten. 3 December 2025, accessed 29 October 2026.
- ↑ 27,0 27,1 Gemeinderat Walchwil: Walchwil prognostiziert im Budget 2025 einen Ertragsüberschuss. In: punkt-walchwil.ch, 22 October 2024, accessed 29 October 2026.
- ↑ punkt-walchwil.ch: Gemeindeversammlung: Von Meisterehren und wegweisenden Beschlüssen. 23 June 2026, accessed 29 October 2026.
- ↑ ZUG4YOU: 34 residential units are to be built on a slope. 7 November 2025, accessed 29 October 2026.
- ↑ Kanton Zug, Wahlen und Abstimmungen: Änderung vom 15. Juni 2012 des Raumplanungsgesetzes (RPG). Vote of 3 March 2013, results by municipality, accessed 29 October 2026.
- ↑ Kanton Zug, Wahlen und Abstimmungen: Volksinitiative “Zersiedelung stoppen”. Vote of 10 February 2019, results by municipality, accessed 29 October 2026.
- ↑ SP Walchwil: Ein Gebot der Stunde: Walchwil als Trägerin des Energiestadt-Labels soll Fotovoltaik-Anlagen auf gemeindeeigenen Liegenschaften errichten. 18 November 2022, accessed 29 October 2026.